We
have a saying, "First we organize, then we manage." With NEXXT's
Design/Build Process our plan must be well organized, our approach finely
tuned, and your team capable of determining best practices in our industry,
and then meeting or exceeding those practices.
|
Pre-construction
is the most important phase of any project. It is where the three critical
elements defining success, cost, schedule and quality, can be most affected.
This phase is about planning and about vision and forward thinking. Far
too often, other construction companies rush clients through the pre-construction
phase to get to the more exciting elements of design without ever examining
the present and future needs of the facility. We are different. The team
at NEXXT knows that meticulous planning of your project will add value
and potentially save you time, stress and money in the end.
Based
upon project size, a Pre-Construction Services Manager skillfully leads
the team of Design Professionals, Consultants, Estimators and you through
the pre-construction phase. During this phase, our team produces a series
of budgets, each one increasing in accuracy as the plans are developed.
Throughout the entire process, we measure design criteria are against
the budget and functional requirements of the project. Aesthetics, without
question, are also a key component that we consider.
Key
milestones are the Preliminary, Schematic, and Design Development phases
of pre-construction.
Preliminary: Conceptual
sketches and feasibility budgeting are the key components of this phase.
We begin to see a design concept develop and begin to assess various
code requirements, zoning ordinances, and other criteria to ensure that
the project is viable. At the conclusion of this phase, we should be
able to determine a zero/plus 20% budget for the project.
Schematic: Picking
up where Preliminary left off, we now concentrate on "massing models" which
help us determine what the building will look like on the outside. We
also begin to refine the floor plan, consult with land planners and
structural engineers; begin evaluating key systems such as HVAC and
Electrical. As the drawings are developed and refined, so is the project
budget. Accuracy levels in this phase are zero/plus 10%.
Design/Development: The
floor
plans are now fully developed, exterior finishes are set, and some building
sections are developed. Upon request, 3-D computer generated renderings
can clearly communicate how the finished building will look. Design/build,
specialty, subcontractors (such as HVAC and Electrical) have been brought
onto the team and firm designs and budgets established. Interior finish
levels have been discussed and agreed to. The team has enough information
to produce a Guaranteed Maximum Price (GMP) for final funding of the
project.
At
the conclusion of each of these phases, the project becomes better defined
and the budget becomes more refined. Although the construction documents
have yet to be created, a Guaranteed Maximum Price (GMP) will be established
for the project. The GMP is your assurance that unless you increase
the scope of the project, the budget will not change. It is here that
the Pre-Construction Services Manager smoothly transitions the leadership
of the team to the Project Manager (PM). The PM is the CEO of the construction
phase. The Project Manager (PM) has full authority to employ all of
the resources necessary to ensure that the project's goals regarding
cost, schedule and quality are met. The PM is responsible for developing
the project schedule, subcontractor performance, payment requisitions,
shop drawing approvals and a host of other responsibilities.
|
This
is the exhilarating, "bricks and mortar" phase of any project.
You'll start to see tangible results of your planning efforts. Your Superintendent,
dedicated to your project, will carefully coordinate the activities of
the subcontractors and our own forces. The PM will meet with key team
members at weekly or bi-weekly job meetings, depending on the requirements
of your project. These meetings are open to you. It is here that the
construction team discusses "mission critical" aspects of schedule
and coordination.
During
visits to the job site, the PM inspects the work to make sure that we
are meeting quality and schedule requirements. We immediately address
any area that is not to our high standards. The PM and Superintendent
sit down with the subcontractors and work collectively to correct any
problems.
You
will also meet our Customer Service Manager (CSM). During construction,
the CSM conducts quality assurance meetings with the subcontractors.
We believe in the old adage that "an ounce of prevention is worth
a pound of cure!" Making sure that key systems and structures are
installed correctly greatly reduces the number of warranty calls later.
Our CSM will also meet with you to review key areas-such as mechanical
systems, ensuring that you completely understand their function and
preventive maintenance requirements and that you are comfortable with
managing the new systems.
|